Research Article | Open Access | Download PDF
Volume 48 | Number 1 | Year 2017 | Article Id. IJETT-V48P206 | DOI : https://doi.org/10.14445/22315381/IJETT-V48P206
“Enhancement of Productivity at Sai Nath Fastners Through Lean Tool’’: PDCA-Demmings Cycle
Uzma Parveen, Prof. Suman Sharma
Citation :
Uzma Parveen, Prof. Suman Sharma, "“Enhancement of Productivity at Sai Nath Fastners Through Lean Tool’’: PDCA-Demmings Cycle," International Journal of Engineering Trends and Technology (IJETT), vol. 48, no. 1, pp. 31-34, 2017. Crossref, https://doi.org/10.14445/22315381/IJETT-V48P206
Abstract
Lean Concept has a good reputation of uncovering waste in manufacturing, survey production and business process by identifying, calculating and removing non value adding steps. Over all Lean is an easy method of recovering a product’s production path from door to door and to various machining operations. In a process survey is done where all non value added actions are searched and identified in each step and between each step there is estimations of its wastage time and resources are identified. Manufacturers face challenges in efficiencies in their manufacturing operations.
Keywords
Demming Cycle,VSM,PDCA.
References
[1] Jerry Kilpatrick, “Lean Principles”, Utah Manufacturing Extension Partnership, 2003
[2] Stephen Corbett, “Beyond manufacturing: The evolution of lean production”, The McKinsey Quarterly, 2007
[3] Michael H. McGivern, Alex Stiber, “Lean ManufacturingTechniques”, Development Dimensions International
[4] Ulrich, K.T. and Eppinger, S.D., Product Design and Development. (McGraw HillNew York, 2001
[5] Freddy Balle, Michael Balle, “Lean Development”, Business Strategy Review, pp. 17-22, Autumn 2005
[6] John S. W. Fargher, “Lean Manufacturing And Remanufacturing Implementation Tools”,Missouri Enterprise, pp. 28-36, 2011
[7] Andersen, B., Business Process Improvement Toolbox. (ASQ Quality Press, Milwakuee, 2007).
[8] Reid, R.R. and Koljonen, E.L., The Deming Cycle Provides a Framework for Managing Environmentally Responsible Process Improvements. Quality Engineering, 1999, 12, pp199- 20